Mosaic gives a clear road map to identify and list the duty holders under the CDM regulations. It also helps in documenting the hazards to be confronted in even the smallest of construction projects.
558 Views
Unfortunately, a principal designer cannot safely organize design meetings during the COVID-19 pande
‘There’s an app for that’ was Apple’s battle cry in their 2009 advert, and we scoffed at the
Since new legislation in 2015, the role of ‘principal designer’ has been one passed around like
A recent study carried out by RIBA showed that 87% of architects agree that digital
Fines for not following health and safety in construction can go into the hundreds of thousands of p
There was a time when the mighty shared spreadsheet took over from paper forms, and all was good. Co
You don’t need to look far at the moment to see how big a legacy can be left by neglecting health